Judson Independent School District End of Woodlake Parkway San Antonio, Texas 1-210-945-5400 Architect: PBK Architects Rudy Rodriquez 210-829-0123
This 42,000 sq.ft. new school addition is a standalone building constructed of a pre-fabricated steel building inclusive of drywall construction for finishes of offices, break room and other sundry areas. Welding Shop is finished out with fire rated non-combustible material and meets all safety codes. Extensive site work included lime injection system with a 12 inch thick slab. A material combination of concrete parking and asphalt was used along with a dock well for shipping. This project was value engineered without compromising quality and time restraints.